Location:
Sunway Putra Mall,Jalan Putra, Chow Kit
Area:
Approximately 600+- sqft
This project involves the full demolish and reinstatement work of a retail lot, returning the unit to its original handover condition as required by the shopping mall. Works include dismantling all built-in structures, repairing affected surfaces, and cleaning the site for proper handover.
Area Protection
Apply floor protection to the mall’s external/common area before work begins.
Dismantling Work
Remove all built-in cabinets, glass, counter, SPC flooring, ceiling, and wiring.
General Cleaning
Clean the site during and after work to ensure tidiness.
Surface Repair
Patch walls and floors, cover holes, and repaint affected areas white.
Waste Disposal
Dispose of all unwanted materials and debris using arranged bins.
Final Reinstatement
Restore the unit to its original condition for mall handover.